Admin Control Room

Complete electrical, data and communications upgrades within the Admin Control Room

Client & Department

BHP

Location

Mining Area C

Project No. and Name

PIN1546
Admin Control Room Upgrade

Value

$330k

Date

March 2020

Project Duration

8 Weeks

Scope of Work & Disciplines

Pindari were engaged by BHP to complete substantial electrical, data and communications upgrades and an associated internal refurbishment, within the Admin Controls Room at Mining Area C (MAC). A detailed scope of works and cost estimate were prepared by Pindari in collaboration with BHP Representatives and stakeholders. Following our initial submission, efficiencies were identified to meet budget constraints.

Disciplines

  • Demolition & Selective Removals
  • Significant Electrical, Data & Communication Upgrades (including Distribution Boards, Cables & Devices, Skirting Duct, Soft Wiring System, Lights, GPOs, Comms Cabinet & Emergency Lighting)
  • Air Conditioning Installation
  • Plasterboard Linings
  • Resilient Flooring (including hydrostatic moisture proof membrane)
  • Patching & Painting Works
  • Workstations and Loose Office Furnitures

Key Challenges

  • Challenging work environment within a key operational area
  • Programmed works around BHP requirements
  • Isolations & shutdowns of key electrical infrastructure coordinated to minimise disruptions to site operations
  • Procurement of extended lead time items over the Christmas period to meet tight project timeframes

The Pindari Advantages

  • Self-execute majority of works, minimising the number of subcontractors required on site
  • Strong HSEQ track record, with no incidents or events throughout the project
  • Our experience of working in live, operational environments minimised disruptions
  • PAB engagement, improving employment and training opportunities for Indigenous personnel

Other Info.

0 incidents, 0 near misses